Key Points
- Manchester City Council has outlined active infrastructure works to improve local roads and pavements, incorporating resurfacing and preventative treatments.
- Roads Minister Justin Madders MP visited a resurfacing scheme in Moston to inspect how local highway investments are being delivered.
- The proportion of Manchester’s roads classified as being in poor condition has fallen from 25% in 2012 to 11%.
- This reduction follows more than £165M in City Council investment across roads, pavements, and drainage infrastructure.
- Nearly 10,000 potholes were repaired in the 2025/26 financial year, consisting of 7,028 on roads and 2,955 on footways.
- For 2027, the council aims to complete 28km of road resurfacing, 34km of preventative surface treatments, 85km of pavement treatments, and 32,000m² of large-scale patching repairs.
- J Hopkins Contractors demonstrated the specialist machinery and planning used to minimise community disruption during the Moston scheme.
- The council oversees over 1,400km of roads, 2,600km of pavements, and 250km of cycleways.
- Executive member Councillor Mandie Shilton highlighted the importance of planned maintenance for long-term infrastructure protection.
- The ministerial visit takes place alongside challenging developments for the wider strategic road network.
Manchester (Manchester Mirror) November 28, 2026 – Manchester City Council has detailed 147km of planned road and pavement repairs for the upcoming period during a ministerial visit by Roads Minister Justin Madders MP, highlighting a long-term drop in poor-condition roads to 11% following over £165M in infrastructure investment.
- Key Points
- What Did Roads Minister Justin Madders MP Inspect During His Visit to Manchester?
- How Much Has Manchester Invested in Road and Pothole Repairs?
- What Are Manchester City Council’s Road Repair Targets for 2027?
- What Did Councillor Mandie Shilton Say About Planned Highway Maintenance?
- What Is the Background of Manchester’s Highway Network Investment?
- How Could These Road Repairs Affect Manchester Residents and Commuters?
What Did Roads Minister Justin Madders MP Inspect During His Visit to Manchester?
Roads Minister Justin Madders MP travelled to Manchester to examine how financial investments in local highways are producing physical improvements across the city. During the visit, the minister inspected an active resurfacing scheme in Moston.
J Hopkins Contractors used the ministerial visit to demonstrate how specialist machinery, skilled operators, and detailed planning support the delivery of highway upgrades while keeping disruption to local communities to a minimum.
How Much Has Manchester Invested in Road and Pothole Repairs?
Manchester City Council manages one of the largest highway networks in the region, encompassing more than 1,400km of roads, 2,600km of pavements, and 250km of cycleways.
Since 2012, when 25% of Manchester’s roads were classified as being in poor condition, that figure has dropped to 11%. This improvement follows City Council investment exceeding £165M across roads, pavements, and drainage infrastructure. Furthermore, the council reported repairing nearly 10,000 potholes during the 2025/26 period, comprising 7,028 repairs on carriageways and 2,955 on footways.
What Are Manchester City Council’s Road Repair Targets for 2027?
Looking ahead to 2027, Manchester City Council has set specific delivery targets across its network:
- 28km of road resurfacing
- 34km of preventative surface treatments
- 85km of pavement treatments
- 32,000m² of large-scale patching repairs across the year
What Did Councillor Mandie Shilton Say About Planned Highway Maintenance?
Commenting on the ministerial inspection and the council’s broader maintenance strategy, Executive Member for Clean Air, Environment and Transport Councillor Mandie Shilton stated: “This visit provided an excellent opportunity to showcase the work taking place across Manchester to maintain and improve our roads. Planned maintenance is about more than fixing defects. It’s about protecting our network, improving journeys and ensuring residents continue to benefit from long-term investment in essential infrastructure.”
Despite the progress reported on local council-managed routes, the ministerial visit occurs amid challenging news regarding the wider strategic road network.
Explore More Manchester Council News
Manchester City Council Unlawfully Sacked Catholic Manager Lorna Young, Manchester 2026
Manchester City Council Unlawfully Sacked Lorna Young Over Beliefs, Manchester 2026
What Is the Background of Manchester’s Highway Network Investment?
Over the past fourteen years, Manchester City Council has focused on reversing road deterioration across its extensive local transport network. In 2012, a quarter of the city’s road network was categorised as being in poor condition.
To address this backlog and prevent further structural decline across its 1,400km of roads and 2,600km of pavements, the authority committed more than £165M into integrated road, footway, and drainage programmes. Shifting focus from reactive pothole filling to proactive resurfacing and preventative surface treatments has been central to lowering the poor-condition rate to 11%.
How Could These Road Repairs Affect Manchester Residents and Commuters?
For Manchester residents, motorists, cyclists, and pedestrians, the scheduled delivery of 28km of resurfacing, 34km of preventative surface treatments, 85km of pavement treatments, and 32,000m² of large-scale patching in 2027 is expected to create temporary local diversions while works are carried out by contractors such as J Hopkins Contractors.
Over the longer term, the preventative measures aim to reduce the formation of new potholes, improve surface safety for cycleway and footway users, and provide more reliable journey times across local routes, even as the wider strategic road network faces ongoing challenges.
